Tippers - freightmoretransport
15506
page-template,page-template-full_width,page-template-full_width-php,page,page-id-15506,bridge-core-2.0.3,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-19.1,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.0.5,vc_responsive
 

Side Tipper

A heavy-duty all-rounder Side-Tipper, suitable for all types of loads including heavy-duty boulders to road-base and gravel.

FEATURES & BENEFITS

  • A standard unit will feature all the necessities such as: JOST landing legs, 24m3 capacity, roll-over PVC tarp, road-train setup, twin-spare cradle, toolboxes, LED Lights.
  • Double welded I-Beam chassis construction allows for a tough and rigid frame
  • 6mm walls, 8mm floor & doors (constructed from high tensile steel)
  • Bin tilting angle of up to 50 degrees.

Price from $ 77K (+GST)

FINANCE AVAILABLE

SPECIFICATIONS

GENERAL

Length

Overall Length 34 FT (10,500mm)

Width

Exterior: 2500mm

Height

Deck Height: 3000mm

Capacity (ATM)

ATM: 40 Tonnes

Tare Weight

9.7 Tonnes

BODY CONSTRUCTION

Side Walls

6mm thick high tensile grade cold pressed sheet steel (650mPa)

Flooring and Door

8mm thick high tensile grade cold pressed sheet steel (650mPa)

Skid-Plate

12mm Thick Skid-Plate, with two position bolt-on king pin boss-plates fitted as standard.

Road-Train Bracket

20mm thick folded C-Channel. With extra support gussets. Constructed from 350mPa mild steel.

Rear Tail-Gate

Standard ADR construction: Industrial C-250 channel – with multiple supports welded. Standrad rear bumper bar installed (constructed from 100 x 100 x 6mm RHS). Includes two “Dozer Push Brackets” at very rear to assist recovery.

UNDERFRAME

Chassis Beams

I-Beam Construction: 20mm thick Flange plates (350mPa), 6mm Webbing plate (450mPa) – Half the chassis webbing is double plated for heavy duty construction.

Landing Gear

JOST A400 Landing Gear (JOST E100 Also used).

King-Pin

JOST 50mm or 90mm available.

WE USUALLY FIT WHEELS/BRAKES AND OTHER CUSTOMISED REQUIREMENT UPON RECEIVING FROM ORDER WITH DEPOSIT, ALLOW 2-3 WEEKS FOR READYING FOR PICK UP..

GALLERY

Device Frame